SCAFFOLDING INSPECTION SHOULD BE CARRIED OUT AT THE FOLLOWING TIMES

before the first use;
within seven days of the first use of the scaffold;
within seven days of the last independent inspection of the scaffold;
after an alteration in the scaffold; and
after adverse weather conditions.
Inspection Services
Scaffold testing conducted by us includes testing of: step ladders and ladders; scaffold ties, nets and other weather protection; harness and other fall arrest equipments; alloy towers, sole plates, base plates, safety decking systems and nets.
We test the percentage of ties, the strength of the ties and the manner of tying the scaffold. We also test the bracing of the scaffolds including transverse and facade bracing and the bracing of standards.