SKID MOUNTED PACKAGES & MODULAR ASSEMBLIES
Fabrication and Assembly of all Types of Skid Packages and Modules including:
- Separators Skids & other Skidded Equipment
- Fuel Gas Conditioning Skids
- Filtration Skids
- Gas Refrigeration Modules
- Gas Dehydration Modules
- Gas Sweetening Modules
- Desalination Plant Modules
- Pipe Rack Modules
Our expertise includes :
- Availability of Water Front Yard to undertake fabrication & Assembly of Very large equipment’s / Modules
- Capability to undertake Electrical & Instrumentation
- Capability to undertake Insulation & Cladding
- Good project management team
- Largest single module fabrication & Assembly undertaken till date is - Single Module of 2750 Tons
The complete package includes Pressure Vessels, Columns, Heat Exchangers, Tanks etc. assembled onto a Skid / Module with all the necessary Piping, Valves, Pumps etc.
Our scope includes :
- Design & Detailed Engineering
- Preparation of Fabrication Drawings of all equipment’s and Skid Frame, Isometric drawings for Piping etc
- Procurement of Materials
- Fabrication of Pressure Vessels, Columns, Tanks, Heat Exchangers and Piping Spools
- Post Weld heat treatment (If required)
- Hydro test, All other Non Destructive Tests, “U” Stamping (if required)
- Complete Fabrication of Structural frames, Ladders, Handrail, Platforms, Piping & E&I Supports
- Painting as per project Specification
- Mounting of all equipments on the frame, complete all interconnecting piping
- Installation of Valves, Pumps, Electrical & Instrumentation etc, Final Assembly & Testing
- Insulation and Cladding (If required)
- Complete QA/QC Documentation and as-built drawings
TOTAL - PAU & PAR Modules Sail-in at Port Arthur, USA
TOTAL - PAU & PAR Modules Sail-out at Hamriyah FZ Port
TOTAL - PAU & PAR Modules Sail-out at Hamriyah FZ Port
TOTAL - PAU & PAR Modules Sail-out at Hamriyah FZ Port
TOTAL - PAU & PAR Modules Sail-out at Hamriyah FZ Port
TOTAL - Largest PAU Module 914-M02 at Hamriyah FZ Port L 70.94 m x W 26.37 m x H 32.20 m Wt 2759 MT
TOTAL - Two PAU Modules Loaded On Ship Bound for Port Arthur, USA
TOTAL - PAU Module Ready for Load-out at QICL Quay
TOTAL - PAU Module ready for Load-out at QICL Quay
TOTAL - Module 917-M14 ready for Load-out at QICL Quay
TOTAL - PAU & PAR Modules Close-up after Load-out at Hamriyah Port
TOTAL - PAU & PAR Modules Close-up after Load-out at Hamriyah FZ Port
TOTAL - Largest PAU Module under Assembly at QICL's Waterfront Yard
TOTAL - PAU & PAR Modules Under Assembly at QICL's Waterfront Yard
ZADCO UZ 750 Gas Dehydration Units
FMC - Gas Custody Transfer Metering Skids for Saudi Electric Co., KSA
FMC - Gas Custody Transfer Metering Skids under dispatch to Saudi Electric Co., KSA
Veolia - Water Treatment Piping Skid
ADNOC Offshore - 700 MT Gas Dehydration Unit
ADNOC Offshore - Gas Dehydration Unit
GASCO Egypt - C2-C3 Piping Skid
MED Evaporator Module – AZ Zour North, Kuwait
MED Evaporator Module – AZ Zour North, Kuwait
MED Evaporator Module – AZ Zour North, Kuwait
MED Evaporator Module – AZ Zour North, Kuwait
Desalination Modules - Petron Bataan Refinery, Philippines
Offshore Bridge - Modular Construction - Das Island
Offshore Bridge - Modular Construction - Das Island
Module - ADGAS - Das Island - Gas Dehydration Modules
Module - ADGAS - Das Island - Gas Dehydration Modules
GASCO – Habshan 5 - Gas Dehydration Modules, UAE
GASCO – Habshan 5 - Gas Dehydration Modules, UAE
ADMA OPCO - IGD HAP - Gas Dehydration Modules
ADMA OPCO - IGD HAP - Gas Dehydration Modules
Desalination Modules - Shoaiba IWPP, KSA
Desalination Modules - Shoaiba IWPP, KSA
Metering Skids for Sec, KSA
ADMA OPCO - Sea Water Filtration Skid
Mukheizna/Oxydental Petroleum - Fuel Gas Conditioning Skid
GASCO Egypt - Propane Refrigeration Package