Evluation Criteria Peb Building Concrete Building Steel Advantage
Building Dimensions
  • Suitable for spans 20-30m. Can sustain much larger spans.
  • Suitable for short span buildings, 5-8m. Becomes difficult and heavy for larger spans.
12%-50% Cost saving for long span steel building
Fabrication
  • Members fabricated in a controlled environment.
  • Precise fabrication.
  • Fabrication done on site.
  • Requires building the reinforcement cage and shuttering work prior to pouring.
90% saving in fabrication time on site.
Delivery and Logistics
  • Can be delivered anywhere in the world.
  • Can be properly sequenced.
  • Might have to build batch plant on site if site is secluded or huge.
Capital Investment saving.
Erection Time
  • Fast erection. Virtually no idle time
  • Slow erection and time consuming.
  • Pouring should take place in limited amount of time. If exceeded, the concrete quality may be jeopardized.
  • The contractor will have to wait for the previous cast to harden (14-28 days) before being able to cast another batch.
50% saving in construction time.
Industrial Applications
  • Can easily handle equipment such as multiple cranes within building.
  • Sways can be controlled.
  • Precision can be achieved during installation.
  • Heavy equipment usage such as cranes is limited.
  • To solve precision problems, contractors use steel I beams and platforms in concrete buildings.
Saving on maintenance cost.
Quality Quality of steel is guaranteed because
  • It is a homogeneous product.
  • Pieces are tailored according to shop drawings.
  • Precise machinery is used for fabrication.
  • It is fabricated under shop control.
  • Quality is not affected by weather conditions
Many factors lead to quality deterioration
  • Concrete is not a homogeneous product
  • Concrete mix ingredient ratios are difficult to maintain.
  • Quality of water used may vary.
  • Weather conditions.
  • Labor experience in pouring.
  • Adequate use of vibrators.
  • Using proper curing methods.
  • Concrete shrinkage.
  • High manpower count may weakan control.
Less time is spent to maintain steel quality.
Cost
  • Low man power count needed.
  • Erection cost is low at site
  • Construction cost is high at site
-
Modulability & Scalability
  • Can change a section of the building or even cancel a section with controlled effort and with little effect on structure stability and functionality.
  • Expansion is easy. Longitudinally expansion is about adding more bays and connecting the secondary members and the sheeting to the old building.
  • Needs a lot of planning and has usually major consequences. Might be even impossible.
  • To expand, the contractor has to build a new structure with foundations, columns and might have to break part of the old structure in order to expand it.
Lower modification cost.
Error Modification
  • Easy to modify on site, even after erection.
  • Modification can be done by cutting, welding or attaching steel pieces.
  • Have to break concrete if modification is necessary.
-
Consistency and Reliability
  • Strength is assured from design.
  • Steel properties are stable with time.
  • Strength cannot be guaranteed without testing.
  • Concrete properties may change over time and environmental conditions
-
Seismic Effect
  • Ductility of steel provides flexible behavior under seismic loads. Light Steel structures minimize the seismic effect on the structure.
  • Steel is heavier than concrete but is 18 times stronger. A steel member can hold 6 times its own weight.
  • Poor flexibility under seismic loads. Heavy structures maximize the seismic effect on the structure.
  • Heavy self weight. Large portion of concrete strength consumed to resist effect of its own weight.
-
Ductility
  • Show signs of failure when overloaded.
  • Gives chance to fix the problem.
  • No warning signs.
  • May result in disastrous collapse.
  • Steel reinforcement is used to prevent brittle failure.
Steel building requires less costly safety measures.

 

FACTORIES

Options Cost of Construction Speed of Construction Ease of Construction
PEB Most Economical Fastest Most Simple
Concrete Less Economical Slowest Cumbersome

WAREHOUSES

Options Cost of Construction Speed of Construction Ease of Construction
PEB Most Economical Fastest Most Simple
Concrete Less Economical Slowest Cumbersome

MALLS & RETAIL SHOPPING CENTERS

Options Cost of Construction Speed of Construction Ease of Construction
PEB Economical Fastest Most Simple
Concrete Most Economical Slowest Most Cumbersome

RECREATIONAL BUILDINGS

 

Need help or have a question?

UAE:
+971508692438
INDIA:
+919825164743
DASHPROJECTS offers one of the most comprehensive Pre-engineered steel buildings-PEB product portfolios globally, with applications in major market segments including heavy industry, infrastructure,
DASHPROJECTS Pre-Engineered Steel Buildings (PEB) The main components of a PEB are built up at the plant with strict adherence to the carefully engineered design and according to the
For a comparison of Pre Engineered Steel Buildings and Conventional Steel Buildings, please click on the below image:     PEB vs
DASHPROJECTS produces sandwich panels in 6 thicknesses: 35 mm, 50 mm, 75 mm, 100 mm, 125 mm and 150 mm, with an excellent slip joint connection for structural strength and weather
The structural steel division at DASHPROJECTS has the capability and capacity to supply structural steel buildings for selected types of projects, including (but not limited to):
Any metal building system, no matter how well designed, may become a continuous source of problems if installed incorrectly. Erection of metal buildings is a specialized field in which
At DASHPROJECTS, our commitment is to always provide: The fastest response to a request for quotation The most competitive prices Proposal drawings to help visualize your
Frames in PEB are mainly rigid frames – comprise of Taper Columns & Rafters, are built using the state of art technology. Splices plates are welded to the ends of the tapered
SSIPL HI-RIB Sheet Profile Metals panels are the most attractive features of Metal Building System, having contributed mightily for the growing popularity of the Metal Buildings. The term
SSIPL Standing Seam Roof System - SSR 600 Standing Seam blends the aesthetics of an architectural panel with the strength of a structural panel. These panels have a good uplifts ratings assuring
Insulated Roof and wall Cladding Heating or cooling is one of the largest operating expense in a building. That's why it is important that each building has good thermal insulation adapted for
When Crane System is required, SSIPL supply includes Columns, Rafters, Brackets, Crane runway beams & lateral tie that support crane system. Clients have to provide complete crane data
The standard mezzanine framing system consists of a steel deck support by joists into main mezzanine beams. If required by design loads, the main beams shall also be supported by
Single Flight Staircase Elevation: Single Flight Staircase with Mid-Landing Plan: Single Flight Staircase with Mid-Landing Double Flight Staircase
Isometric : Curved Eaves Roof Extension at Eave (without Soffit) Roof Extension at Eave (with Soffit) Canopy with Curved Eaves with Bottom
        Fascia System   Flush Fascias with Eave Gutter Typical Sidewall Section forFlush FasciaTypical Endwall Section forFlush Fascia
Jack Beams are used to make economical as well as safe approach for creating longer bay length when large unobstructed space, is required. Common bay lengths (5,6,7,8,9 & 10) can be
Ridgevent System S-Type Louver Detail Roof Monitor Turbovent Fixing Detail Gutter / Downspout Fixing To Wallpanel Using
 Described in few words, pre-engineered buildings are ideal for any non-residential low-rise building. Applications of pre-engineered buildings are numerous. Browse through our library
Purlins, girts and eave struts are secondary structural members used to support the wall and roof panels. Purlins are used on the roof; girts are used on the walls and eave struts are used at the
DashProjects offers a complete line of Wall/Roof panels, panel related accessories, trims, purlins, girt, eave gutters, downspouts, curved eaves, wall flashings and louvers for a wide range of
The panels used in the construction of DashProjects Pre-Engineered Buildings are composed of the following: Base metal of either Galvalume coated steel conforming to ASTM A 792M Grade 345B or
Liner panels have one metal skin surface with polystyrene foam board adhered to it for better insulation. In the past 20 years, end-users, contractors and consultants have become increasingly aware
Drawings DASHPROJECTS produces its own shop drawings for the fabrication of your steel joists, trusses, structural steel components, steel deck and girts. For project design, bid preparation or
Open web steel joist (OWSJ) is a lightweight steel truss consisting, in the standard form, of parallel chords and a triangulated web system, proportioned to span between bearing points. The main use
 Steel deck is a cold formed corrugated steel sheet supported by steel joists or beams. It is used to support concrete or insulating membrane of a roof. DASHPROJECTS decks are based on load
Combining DASHPROJECTS joists with poured concrete, the system consists of hybrid concrete/steel T-beams running in one direction and an integrated continuous slab in the other (see drawing below).
The success of any project involving steel-intensive construction is dictated by the efficiency in erection of the structural steelwork. With a proven track record in regards to safety, our
Primary members are the main load carrying and support members of a pre-engineered building. The main frame members include columns, rafters and other supporting members. The shape and size of these
Secondary structural framing refers to purlins, girts, eave struts, wind bracing, flange bracing, base angles, clips and other miscellaneous structural parts. Purlins, girts and eave struts are cold
 ROOF  &  WALL (AVAILABLE IN ALL REGIONS)   DASH standard steel panels are 0.5 mm or 0.6 mm thick and have a minimum yield strength of 345 MPa. Steel
Steel exhibits desirable physical properties that make it one of the most versatile structural materials. Some of its properties such as strength, uniformity, light weight, ease of use, etc., make it
When it comes to fit out, no one has a better track record than DASHPROJECTS. But we’ve never been much for resting on our laurels. When it comes to professional
Great technology is no longer an afterthought. We believe all work environments are technology environments. We believe all business environments are technology
When it comes to construction, our vision is our customer's vision. We drive dynamic solutions to reach exceptional results. When it comes to construction, our vision
DASH PROJECTS  Central Engineering Department is located in DUBAI UAE  Our engineering department is composed of 2 sections; Steel Design section & Steel Detailing section. DASH
DASHPROJECTS (DASH) owns several factories to fabricate structural steel, Pre-engineered Buildings and material handling systems. These factories are located in Egypt, Syria and UAE . Our factories
In DASHPROJECTS (DASH), the project management team, selected and led by the project manager, is responsible for coordinating and integrating activities across multiple functional lines: A-The
Erection / installation of the company’s projects are implemented by developing the erection method statement considering the complexity of the Job, project schedule, site logistics,
Pre-engineered steel buildings can be fitted with different structural accessories including mezzanine floors, canopies, fascia, interior partitions etc. and the building is made water proof by use
DASHPROJECTS  Structural Steel business unit had executed different categories of projects such as Industrial buildings, Airports terminals, Airport Hangers, warehouses, sport complex,
Structural steel and plate construction associated with crusher plants, cement factories, batching plants, block factories and sorting plants to be used as rock box hoppers, silos, chutes, conveyors