PEB Building Systems
DASHPROJECTS Pre-Engineered Steel Buildings (PEB)
The main components of a PEB are built up at the plant with strict adherence to the carefully engineered design and according to the client’s needs. Pre-engineered buildings have 3 main components:
- Primary built up members: Columns: vertical members from the ground up. Rafters: horizontal members connecting the top of the columns.
- Secondary members: longitudinal members running along the length of the building, connecting to the main frame. Cold formed “Z” and “C” shaped purlins and girts.
- Sheeting: the outside covering of the buildings.
DASHPROJECTS delivers uncompromising quality in the growing market demand for PEB’s, which are widely used around the world. The advantages of pre-engineered buildings (PEB) include:
- One source for the total building solution
- Guaranteed 6 – 8 weeks production time
- Lower cost due to efficient design and lighter structure
- Higher quality achieved due to controlled production environment
- Longer clear span options (without interior columns)
- Low maintenance requirements
- Quick turnkey construction
- Effectively zero construction waste
- Highly energy efficient and recyclable
Some of the buildings that DASHPROJECTS produces include:
- Warehouses
- Showrooms
- Shopping centers
- Supermarkets
- Distribution centers
- Exhibition halls
- Factory buildings
- Aircraft hangars
- Cold storage
- Labor camps (accommodation)
- Parks and sports centers
- Office buildings
- Residential buildings
- Multi-storey buildings